Project Scope


  • Design and develop an additional 750L fuel tank to extend machine operation by 6 hours without refueling

  • Perform G-load analysis to assess stress on parent material for evaluating component life

  • Conduct modal analysis to identify natural frequency and mode shapes.

  • Provide technical insights through design iterations and structural analysis discussions


Business Challenges


  • Optimize tank geometry for size, shape, and weight constraints

  • Design efficient baffle layout to ensure stable fuel flow

  • Minimize parts and welds for cost-effective manufacturing

  • Ensure assembly feasibility through optimal mounting point selection

  • Improve manufacturability with accessible welding zones and proper bend radii

  • Simulate performance through structural and pressure analysis under varied load cases


ARi’s Solutions


  • Collaborated with onsite engineering team to evaluate space constraints and structural integration

  • Validated frame strength and fuel tank loading conditions using FEA

  • Executed multiple design iterations to ensure compliance with performance criteria

  • Recommended enhancements for component life based on analysis findings

  • Conducted regular technical reviews and discussions with client stakeholders


ARi’s Value Proposition


  • Early Delivery: Delivered the project ahead of schedule, allowing the customer to start production sooner

  • Cost Savings: Identified design and manufacturing issues early, helping the customer avoid extra costs and rework

  • Reduced Downtime: Optimized design reduced shutdown time by 20%, improving overall machine productivity

  • Technical Improvements: Enhanced the fuel tank’s reliability and performance, ensuring longer-lasting operation


Download
Case Study

Download Case Study

Case Studies

Related

Welding Fixture Design for Truck Body

2025

Welding Fixture Design for OHT’S

2025

Truck Body Welding Line Layout Development

2025

Reverse Engineering – Warm Forge Die Set

2025

Design of Lifting Tackles with Turnover Scope

2025

Design of Lifting Tackles for Simple Components

2025

Design of Lifting Tackles for Large Products

2025

Design of Lifting Tackles for Complex Components

2025

https://www.arigs.com/wp-content/uploads/2025/11/New-Design-Additional-Extra-Capacity-Fuel-Tank-Analysis.pdf