Project Scope
- Develop a simulation model for the existing front and rear frame assemblies
- Perform load analysis at lifting points (4X):
- Proof Load: 20 kN & Breaking Load: 53 kN
- Perform load analysis at tie-down points:
- 25 X Proof Load: 23 kN (transverse), 74 kN (longitudinal)
- 2 X Breaking Load: 37 kN (transverse), 119 kN (longitudinal)
- Conduct static load analysis to evaluate stresses on the parent material and weld joints under these load conditions
Business Challenges
- Develop detailed simulation models of the frame assemblies and critical components
- Integrate both front and rear frame models into a single analysis
- Apply realistic fixed constraints at frame mounting locations
- Accurately simulate complex loading at lifting and tie-down points
ARi’s Solutions
- Worked closely with onsite engineers to clarify scope and track progress
- Created accurate and up-to-date simulation models using Creo
- Conducted thorough static analyses to evaluate structural behavior
- Provided technical recommendations to improve component life and performance under stress
ARi’s Value Proposition
- Improved Safety Assurance: Identified critical stress points under extreme load cases, helping the customer validate lifting and tie-down safety
- Cost Avoidance: Early detection of high-stress areas helped the customer avoid expensive rework and ensured weld strength compliance
- Faster Decision Making: Delivered reliable simulation results that supported quicker engineering approvals and reduced testing time
- On-Time Delivery: Completed and delivered the project on schedule, helping the customer maintain their product launch timelines