Design of Brazing Fixture
Home Case Studies Design of Brazing Fixture
Project Scope
Design of brazing fixture.
Business Challenges
The complexity of the GA level tubing required to be broken down into sub-assemblies and design separate preparatory fixtures.
ARi’s Solutions
- Fixture designed facilitate the accessibility for the operator to perform the brazing operation at selected locations
- Easy handling provisions made in the fixture to ensure the brazing location is perpendicular to the ground level
- Simple clamping solution identified and implemented
ARi’s Value Proposition
Simplified design.