Rebound Resilience Testing Machine (SPM)

Project Scope


  • To test 100nos rubber per day

  • Automation of the complete process

  • Preheat the Rubber specimen for 60-80 degree for 1hr

  • After rubber specimen to be test on Zwick machine


Business Challenges


  • Low Productivity & Human Error – Precise operation

  • Low Efficiency – Manual loading rubber

  • Non-availability of Skilled manpower

  • Lack of Safety


ARi’s Solutions


  • Designed & developed special purpose machine for rebound Resilience test

  • Complete automation for loading and unloading machine

  • Rubber specimen travels to the oven conveyor within 1 hour after picking and placing the process on servo motor


ARi’s Value Proposition


  • Test Rubber 100 nos. per day

  • 100% accurate testing vs manual testing

  • 80-100% cost saving by automation over manual/labour work

  • Improved quality, Accuracy & Repeatability

  • Improved Safety & productivity

  • Minimizes operating cost


Download
Case Study

Download Case Study

Case Studies

Related

Welding Fixture Design for Truck Body

2025

Welding Fixture Design for OHT’S

2025

Truck Body Welding Line Layout Development

2025

Reverse Engineering – Warm Forge Die Set

2025

Design of Lifting Tackles with Turnover Scope

2025

Design of Lifting Tackles for Simple Components

2025

Design of Lifting Tackles for Large Products

2025

Design of Lifting Tackles for Complex Components

2025

https://www.arigs.com/wp-content/uploads/2025/11/Rebound-Resilience-Testing-Machine-SPM.pdf