Design of Brazing Fixture

Project Scope

Design of brazing fixture.


Business Challenges

The complexity of the GA level tubing required to be broken down into sub-assemblies and design separate preparatory fixtures.


ARi’s Solutions


  • Fixture designed facilitate the accessibility for the operator to perform the brazing operation at selected locations

  • Easy handling provisions made in the fixture to ensure the brazing location is perpendicular to the ground level

  • Simple clamping solution identified and implemented


ARi’s Value Proposition

Simplified design.


Download
Case Study

Download Case Study

Case Studies

Related

Welding Fixture Design for Truck Body

2025

Welding Fixture Design for OHT’S

2025

Truck Body Welding Line Layout Development

2025

Reverse Engineering – Warm Forge Die Set

2025

Design of Lifting Tackles with Turnover Scope

2025

Design of Lifting Tackles for Simple Components

2025

Design of Lifting Tackles for Large Products

2025

Design of Lifting Tackles for Complex Components

2025

https://www.arigs.com/wp-content/uploads/2025/11/Design-of-Brazing-Fixture.pdf