Line Design & Optimization for Leading Fan Guard Manufacturer

Project Scope

To develop an optimized layout for fan guard manufacturing line for 2000 nos capacity.


Business Challenges


  • Simulate the process by using process analysis in PDMC software and identify the bottle neck area to create line balance in assembly line

  • Tools: PDMC


ARi’s Value Proposition


  • Validate the space requirement by animation and understand the process and material movement

  • Layout in 2D & 3D (layout will have all the machine tools boundaries, fixtures, storage racks and other equipment as applicable)

  • Material flow and assembly process in animation video

  • Line balance report


Download
Case Study

Download Case Study

Case Studies

Related

Welding Fixture Design for Truck Body

2025

Welding Fixture Design for OHT’S

2025

Truck Body Welding Line Layout Development

2025

Reverse Engineering – Warm Forge Die Set

2025

Design of Lifting Tackles with Turnover Scope

2025

Design of Lifting Tackles for Simple Components

2025

Design of Lifting Tackles for Large Products

2025

Design of Lifting Tackles for Complex Components

2025

https://www.arigs.com/wp-content/uploads/2025/11/Line-Design-Optimization-for-Leading-Fan-Guard-Manufacturer.pdf