Existing Walk Behind Scrubber Drier Machine

Project Scope


  • Redesign and develop the existing walk-behind scrubber drier machine

  • Improve aesthetics, address field failures, and add enhanced features

  • Ensure minimal impact on production cost, machine weight, and overall dimensions


Business Challenges


  • Manage complete product development lifecycle: concept to production

  • Lead cross-functional collaboration with manufacturing engineering for in-house feasibility

  • Deliver a design compliant with APQP standards

  • Maintain the machine’s core performance specifications


ARi’s Solutions


  • Delivered a comprehensive 3D product redesign addressing both function and form

  • Released detailed production-ready drawings for manufacturing

  • Led execution with 2 engineers and workshop technicians under tight coordination


ARi’s Value Proposition


  • Resolved 12+ field and manufacturing issues, reducing rework by 30%Delivered the project 2 weeks ahead of schedule

  • Saved approx. ₹5–6 lakhs in potential warranty and rework costs

  • Cut assembly time by 15% with modular design improvements


Download
Case Study

Download Case Study

Case Studies

Related

Welding Fixture Design for Truck Body

2025

Welding Fixture Design for OHT’S

2025

Truck Body Welding Line Layout Development

2025

Reverse Engineering – Warm Forge Die Set

2025

Design of Lifting Tackles with Turnover Scope

2025

Design of Lifting Tackles for Simple Components

2025

Design of Lifting Tackles for Large Products

2025

Design of Lifting Tackles for Complex Components

2025

https://www.arigs.com/wp-content/uploads/2025/11/Existing-walk-behind-scrubber-drier-machine.pdf