Brazing Fixture Design – HVAC components
Home Case Studies Brazing Fixture Design – HVAC components
Project Scope
Design of Brazing Fixtures for copper tubing schematic in HVAC components such as Chiller units.
Business Challenges
The complexity of the GA level tubing required the design to be split into sub-assemblies and design preparatory fixtures separately.
ARi’s Solutions
- Fixture designed to facilitate the accessibility for the operator to perform the Brazing operation at selected locations.
- Easy handling provisions are made in the fixture to ensure the brazing location is perpendicular to the ground level.
- Simple clamping solution identified and implemented.
ARi’s Value Proposition
Splitting the GA assembly into sub-assemblies for brazing has proven beneficial in controlling the overall dimensions and the ease of operator accessibility to the brazing surfaces.